Major systems involved include main steam, main feedwater and startup feedwater, bypass, high-pressure heater circuits,circulating water, condensate, heater drains, exhaust, auxiliary steam, condenser vacuum pumping, turbine-generator lubricating oil, condensate polishing, and secondary circuit sampling systems. These projects involved welding the main steam piping, steam guide pipes, reheat steam piping (cold and hot sections),